Close

Naval

SOFRESID ENGINEERING: historic player in the civil, military and offshore naval industry, and in new construction, in-service maintenance (MCO) and conversion.

From studying the general plans of a ship, through the sizing of a hull girder, to the hydrodynamic and stability studies, SOFRESID ENGINEERING is capable of defining all systems and equipment, from engine room to bridge, as well as all standard or mission-specific gear.

We also support our shipbuilder, naval dockyard, and oil & oil service company clients in the class certification process (BV, DNV, ABS, RINA, Lloyd’s, etc.) and in construction monitoring, during trials and commissioning.

FLEET OF SHIPS

Production date: since 2002

Project description: Studies of various modifications / adaptations: DP3 passage, heave compensation, stringers, crane capacities… FDS, FDS2, SAIPEM 3000, SAIPEM 7000, CASTORONE ships.

SUBMARINES

Production date: since 1986

Project description: Functional, accommodation, structure, industrialization and in-service maintenance studies: SNA, SNLE NG,

SMALL-SCALE LNG TANKER

Production date: 2015

Project description: Conceptual study.

SCRUBBERS – VENTURA

Production date: 2017

Project description: Scrubbers integration studies on cruise ship MS VENTURA (P&O cruises).

SURFACE VESSELS

Production date: since 1986

Project description: Functional, accommodation, structure, industrialization and in-service maintenance studies: PA CDG, LAFAYETTE, SAWARY 2, DELTA, HORIZON, BPC, FREMM, GOWIND.

PAZFLOR FPSO

Production date: 2006

Project description: Basic engineering of the entire floating unit (hull, engine room zones, cargo zones, living quarters, deck).

MOHO NORD FPU

Production date: 2011-2012

Project description: Basic engineering of the layout of the rear zone of the floating unit (engine room zone and living quarters).

FSRU TOSCANA

Production date: 2009-2010

Project description: Conducting all the engineering (front-end + detailed) to convert the LNG tanker into an FSRU.

ENI FLNG

Production date: 2012-2013

Project description: Basic engineering for the entire hull of the FLNG.

SCARBOROUGH FLNG

Production date: 2015

Project description: Pre-project (front-end) engineering.

FPSO KAOMBO

Production date: 2016-2017

Project description: Conducting all the detailed engineering to convert two tankers into FPSOs.

 

Réalisation Zip.fr | Création de sites Internet Zip Agence Digitale